Everything posted by JaiKai
-
Nissan has built an electric R32 GT-R
Thought this was fake news but seems it's real https://www.topgear.com/car-news/retro/batten-down-hatches-nissan-has-built-electric-r32-gt-r
-
NEC 2024
Smooth vs textured plastics maybe.
-
NEC 2024
Dash looks yellow but i think that's just the lighting from the spots lights around it as the rear centre break is also yellow
-
What's this connector.
I used to own a UK spec with heated mirrors and this plug was always spare. I've always presumed it was a test location.
-
Not 100% zed related
-
RIP Geoff Capes
Used to love watching this guy and also big daddy and giant haystacks. Brings back memories. RIP
-
Couple of niggles
Bend the small metal clasp carefully on the fuel flap, makes it more springy and will release faster. Shaking at speed can be an imbalance of the steering column or wheels. Check and see if any balance weights have fallen off your wheels is the first thing I would look at.
-
Not 100% zed related
A little update All the wall wiring, rockwool insulation was installed this week and then i started on fiting the new plaster board. The ceiling is nearly complete and should be done be end of today.
-
newbie mercedes enthusiast
Hosting pictures is a premium feature.
-
New owner registered from 2017 🫣
Hi, Welcome to the club, my first zed was a silver na, Best feeling in the world driving it home.
-
SALE - Breaking - Black 1997 TT
Was it a full conversion or just the gearbox, sorry i managed to wipe out my full mail box last week. Forward me on the PM if you still have it. I have multiple gearbox's so can do a full conversion as well as well as a separate box
-
o2 and nox emissions document?
All the service manuals are located in the downloads section : https://www.300zx-owners.club/files/ You may find information in there but unsure of particular file its in. They are all PDF files split up into sections of the original service manual.
-
SALE - Breaking - Black 1997 TT
Finally happening, 6 months after i originally wanted but i have organised a few family members and we shall start breaking the black zed up next week. So can everyone who originally wanted something give me a quick reminder below.
-
Not 100% zed related
Great progress made over the last fews days with my new office build. Walls and ceiling are built and after i order the insulation next week we plan to put the plaster board up on the inside.
-
SALE - Vented Node Panel in Silver
Yes, Still have in my garage. Paypal to lee.young@ayrshireit.com along with your address and i can get it shipped out.
-
Happy birthday Nickz32
Happy Birthy Nick
-
WANTED - Wanted - SWB rear glass or tailgate
Not for a shortie, i have two spare for the lwb 😇
-
NEC 2024 - volunteers needed
Be a miracle if i make this 😪
-
Not 100% zed related
-
What did you do to your zed today?
-
Not 100% zed related
-
Not 100% zed related
Lease agreed and signed, hopefully get the keys in the next few days. 😎
-
Happy birthday bird
Happy Birthday Lee
-
SALE - Breaking - Black 1997 TT
I'll make it worth it. This is the new works unit i hope to be in to next month. After i'm in and i get the place fully secure i will start stripping the parts for everyone.
-
Not 100% zed related
I've not been working on my zed for a very long time, since the last engine failure to be more precise. Few months back i managed to get a lockup in my area which i originally planned to move all my zeds into and start working again stripping and building back up what i needed to get the purple zed back on the road. However this place wasn't exactly insured in any way and also wasn't the best place for security either so only the two breakers were moved in, then unfortunately time went on and i never had time to do much on them. The only thing i've managed to do on the breaker was lift one of the spare engines out, and that's now sitting on a spare tyre. Working out costs of this unit and the costs of the office that i currently rent i'm taking the opportunity to combine both next month and upgrade my unit to a proper works unit and build and move into a new office. The new place is clinically clean compared to the old unit but it will likely take a month to move everything over and then i still need to build my new office inside that unit too; so lots to do in a month. Planning wise we are going to build a new office base inside this larger unit with an operational place to work with the garage being used for stock and the play toys. This place will be fully insured, alarmed and covered by cctv so happy to move the purple zed in and start work again. So hopefully within a month i'll get the old zeds fully broken up and the purple zed finished with the working engine out the black zed for now and in the future when i get the performance engine back off jimmer i can get that fitted. Lots to do over the next months and with me wanting to attend the NEC this year again we dont have much time to do it all.