Well after having the car for 6-7 weeks I've finally started work, doesn't help the new place doesn't have a garage!:no:
Managed to fit in some part collections with work meetings :thumbup1: so picked up a front bumper from Oxford, rear bumper from Leicester, next week side skirts from Preston and seats from Windsor! Also have spacers and longer wheel studs for rear wheels and 25mm drop lowering springs ready.
But the boring stuff first, the turbo water feed at the back of the engine is leaking so started taking the plenum off to get at it. Two hours later and it's still on :no: forgot how much of a pain in the arse it was, still a bypass and egr delete while it's off. Will post up some pics tomorrow, only planning cosmetic work for the next few months so I can enjoy the summer in it. Then winter for the power and manual conversion :devil2:
Well after having the car for 6-7 weeks I've finally started work, doesn't help the new place doesn't have a garage!:no:
Managed to fit in some part collections with work meetings :thumbup1: so picked up a front bumper from Oxford, rear bumper from Leicester, next week side skirts from Preston and seats from Windsor! Also have spacers and longer wheel studs for rear wheels and 25mm drop lowering springs ready.
But the boring stuff first, the turbo water feed at the back of the engine is leaking so started taking the plenum off to get at it. Two hours later and it's still on :no: forgot how much of a pain in the arse it was, still a bypass and egr delete while it's off. Will post up some pics tomorrow, only planning cosmetic work for the next few months so I can enjoy the summer in it. Then winter for the power and manual conversion :devil2: